Benchwork Pt. 3

Last night I got the legs attached to the benchwork. It was a somewhat laborious project, and was made more difficult by the distinct downward slope of the floor in the room that I am building the layout in. With that complete, I can move on to adding a foam board layout surface.


One end of the new benchwork. The legs at the far end of the layout had to be shortened by about half an inch to make the layout level.


The other end of the layout. This contains the Low's Bridge layout section that I posted about the other day.


A panoramic view of the benchwork, ready to have foam board attached.


Comments